- Postcode districts
- BS21
- Nearby
- Nailsea, Portishead and Weston-super-Mare
- Guide price
- £6,100–£12,250
- Typical time on site
- 5–10 working days
- Water
- Hard across most of Somerset
- Survey
- Free, at your home
What does a wet room cost in Clevedon?
For Clevedon, our guide range for a wet room is £6,100 to £12,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for Clevedon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Clevedon
In Clevedon we cover BS21; we also cover Nailsea, 4.3 miles away, and Portishead.
Being a smaller town does not change how we work in Clevedon: free survey, written quote, one team. In a compact Clevedon bathroom, a wet room frees the space a tray and enclosure would take, but expect the whole floor to get wet. We quote wet rooms in Clevedon only after looking at the floor construction, because that is where most of the cost difference lies.
Supplies across most of Somerset are hard. If your supply in Clevedon is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Slip-resistant porcelain floor tiles and wall tiling
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- Strip-out, waste removal, a final flow test to the drain and handover
- A frameless glass screen fixed to the wall and floor
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Linear or centre drain
A linear drain along one wall lets the floor fall in a single direction, so large tiles can be laid without awkward cuts. A centre drain needs a four-way fall and suits smaller tiles or mosaic.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

