- Postcode districts
- DN8
- Nearby
- Goole, Doncaster and Bentley
- Guide price
- £5,600–£11,250
- Typical time on site
- 5–10 working days
- Water
- Moderately hard across most of South Yorkshire
- Survey
- Free, at your home
What does a wet room cost in Thorne?
As a guide, budget £5,600 to £11,250 including VAT for a wet room in Thorne; your written quote will pin it down. We adjust the national guide for Yorkshire and the Humber, where prices are typically about 7% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Thorne including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Thorne
We cover every part of Thorne, including DN8, and nearby Goole (7.3 miles) and Doncaster (9.2 miles).
Being a smaller town does not change how we work in Thorne: free survey, written quote, one team. If your Thorne home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. If your Thorne bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor.
Supplies across most of South Yorkshire are moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Thorne. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- A frameless glass screen fixed to the wall and floor
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Open or screened
A fully open shower with no glass only works in a larger room, with the basin, WC and towels well away from the spray.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

