- Postcode districts
- IP14
- Nearby
- Ipswich, Bury St Edmunds and Sudbury
- Guide price
- £6,400–£12,750
- Typical time on site
- 5–10 working days
- Water
- Very hard across most of Suffolk
- Survey
- Free, at your home
What does a wet room cost in Stowmarket?
For Stowmarket, our guide range for a wet room is £6,400 to £12,750 including VAT. Labour costs in East of England put local prices at about 6% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Stowmarket including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Stowmarket
In Stowmarket we cover IP14; we also cover Ipswich, 11.2 miles away, and Bury St Edmunds.
Stowmarket gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If your Stowmarket home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. For a wet room in a Stowmarket flat, the first step is the lease, because freeholder consent is often needed before any work starts.
Water across much of Suffolk is very hard. If your supply in Stowmarket is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- Strip-out, waste removal, a final flow test to the drain and handover
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Linear or centre drain
A linear drain along one wall lets the floor fall in a single direction, so large tiles can be laid without awkward cuts. A centre drain needs a four-way fall and suits smaller tiles or mosaic.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

