- Postcode districts
- UB3, UB4, UB11
- Nearby
- Southall, Heston and Greenford
- Guide price
- £2,500–£6,200
- Typical time on site
- 2–6 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bath to shower conversion cost in Hayes?
In Hayes, a bath to shower conversion typically costs £2,500–£6,200 including VAT, based on London prices. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Tray and enclosure
- Bath removed, tray in its place
Walk-in shower
- Concealed valve, rainfall head
Level-access floor
- Grab rails and seat options
Guide prices for Hayes including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hayes
In Hayes we cover UB3, UB4 and UB11; we also cover Southall, 2.3 miles away, and Heston.
London homes in Hayes often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If your Hayes bathroom was refitted recently and you like the rest of it, we can convert just the bath area and finish the new tiling neatly against the old. If you are applying for a grant towards a bath to shower conversion in Hayes, we provide the itemised written quote the council will ask for.
Water across much of Greater London is very hard. If your supply in Hayes is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Grab rails and a fold-down seat if you want them
- A survey of the bath space, the waste position, the floor and your water system
- A low-profile tray, or a former and tanking for a level-access floor
- Boarding, tanking and re-tiling of the shower walls
Decisions to make first
Safety extras
A fold-down seat, grab rails and a slip-resistant tray cost little at the time of fitting and are much harder to add later.
How much to re-tile
Re-tile just the shower walls, or take the chance to re-tile the whole room so new and old tiles never have to match.
Rules that apply in England
In England, adding an electric shower usually means a new circuit, which is notifiable under Part P, as is any change to the wiring in the bathroom. Where the conversion is an adaptation for a disabled person, a Disabled Facilities Grant of up to £30,000 may help, but the council must approve it before work starts.

