Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Hampshire · PO1

Bath to shower conversions in Southsea

We cover bath to shower conversions in Southsea and the rest of Hampshire. Every job starts with a measured survey at your home and a written price before anything is ordered.

£2,200–£5,600 inc VAT2–6 working daysFree home survey
Former bath space converted to a walk-in shower, example for Southsea
Postcode districts
PO1, PO4, PO5
Nearby
Portsmouth, Gosport and South Hayling
Guide price
£2,200–£5,600
Typical time on site
2–6 working days
Water
Hard across most of Hampshire
Survey
Free, at your home

What does a bath to shower conversion cost in Southsea?

In Southsea, a bath to shower conversion typically costs £2,200–£5,600 including VAT, based on South East England prices. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.

Walk-in shower

£3,400–£6,200
  • Full-height tiling

Level-access floor

£5,000–£9,000
  • Floor former and tanking

Guide prices for Southsea including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Southsea

We cover every part of Southsea, including PO1, PO4 and PO5, and nearby Portsmouth (1.1 miles) and Gosport (1.9 miles).

Being a smaller town does not change how we work in Southsea: free survey, written quote, one team. If your Southsea bathroom was refitted recently and you like the rest of it, we can convert just the bath area and finish the new tiling neatly against the old. We check the floor under the bath during a Southsea survey where we can, because old leaks can leave soft boards.

Water across much of Hampshire is hard. If your supply in Southsea is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Silicone, a full-flow test and a tidy finish where the new tiling meets the old
  • Repair or replacement of floorboards where the bath has left them soft or damaged
  • A survey of the bath space, the waste position, the floor and your water system
  • Boarding, tanking and re-tiling of the shower walls

Decisions to make first

Low tray or level floor

A low-profile tray has a small lip. A level-access floor removes the step altogether but needs a former, tanking and a linear drain.

Your only bath?

If this is the only bath in the house, think about whether you, or a future buyer, will want one before you commit.

Rules that apply in England

In England, adding an electric shower usually means a new circuit, which is notifiable under Part P, as is any change to the wiring in the bathroom. Where the conversion is an adaptation for a disabled person, a Disabled Facilities Grant of up to £30,000 may help, but the council must approve it before work starts.

More about bath to shower conversions

Bath to shower conversions in Southsea: questions

How much does a bath to shower conversion cost in Southsea?

A bath to shower conversion in Southsea usually costs £2,200–£5,600 including VAT. Where you land in that range depends on the size of the room, whether the layout changes and the products you choose. After the free survey you get an itemised written quote, and the price is fixed in writing once the layout and products are agreed.

Who handles building control for a bath to shower conversion in Southsea?

Building control for Southsea is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bath to shower conversion take?

Allow 2–6 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Southsea.

Is the home survey in Southsea really free?

Yes. We visit, measure the room, check the pipework, drainage and electrics, and talk through what you want. You then get a written, itemised quote with no obligation to go ahead.

Should I choose an electric or a mixer shower?

Choose a mixer if your boiler or cylinder gives good hot-water flow; it usually gives the stronger shower. Choose an electric shower if stored hot water is limited or you want a shower that works when the boiler is off. An electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit.

Bath to shower conversions in Southsea

Book a free home survey in Southsea. You get a measured layout and an itemised written price before anything is ordered.