- Postcode districts
- RG40, RG41, RG45
- Nearby
- Crowthorne, Bracknell and Lower Earley
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Berkshire
- Survey
- Free, at your home
What does a new bathroom design cost in Wokingham?
Design comes with the job: the survey, layout and itemised quote are free. In Wokingham, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Wokingham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Wokingham
As well as Wokingham itself (RG40, RG41 and RG45), we survey in Crowthorne, Bracknell and Lower Earley.
In Wokingham, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For loft rooms and sloping ceilings in Wokingham homes, the design checks head height where you stand, not just the floor area. A design survey in Wokingham covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Most of Berkshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A conversation about who uses the room, when, and what does not work about the current one
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

