- Postcode districts
- RG2, RG5, RG6
- Nearby
- Reading, Wokingham and Crowthorne
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Berkshire
- Survey
- Free, at your home
What does a new bathroom design cost in Lower Earley?
Design comes with the job: the survey, layout and itemised quote are free. In Lower Earley, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Lower Earley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Lower Earley
As well as Lower Earley itself (RG2, RG5 and RG6), we survey in Reading, Wokingham and Crowthorne.
In Lower Earley, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For loft rooms and sloping ceilings in Lower Earley homes, the design checks head height where you stand, not just the floor area. If you are in Lower Earley and weighing a bath against a walk-in shower, the layout options show both with their prices.
Supplies across most of Berkshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

