- Guide price
- £6,700–£13,500
- Typical time on site
- 5–10 working days
- Water
- Hard across most of Berkshire
- Survey
- Free, at your home
What does a wet room cost in Lower Earley?
Our guide price for a wet room in Lower Earley is £6,700–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Lower Earley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Lower Earley
In Lower Earley we cover RG2, RG5 and RG6; we also cover Reading, 3 miles away, and Wokingham.
In Lower Earley, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If you are planning a wet room in Lower Earley for level access, we design the fall and drain so the floor is flush from the doorway. We quote wet rooms in Lower Earley only after looking at the floor construction, because that is where most of the cost difference lies.
Supplies across most of Berkshire are hard. If your supply in Lower Earley is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Strip-out, waste removal, a final flow test to the drain and handover
- Slip-resistant porcelain floor tiles and wall tiling
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.