- Postcode districts
- PE29
- Nearby
- St Ives, St Neots and Cambridge
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Cambridgeshire
- Survey
- Free, at your home
What does a new bathroom design cost in Huntingdon?
Design comes with the job: the survey, layout and itemised quote are free. In Huntingdon, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Huntingdon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Huntingdon
We cover every part of Huntingdon, including PE29, and nearby St Ives (4.6 miles) and St Neots (8.6 miles).
Huntingdon gets the same process as anywhere else: a free survey at your home and a written, itemised quote. For loft rooms and sloping ceilings in Huntingdon homes, the design checks head height where you stand, not just the floor area. If your Huntingdon bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Supplies across most of Cambridgeshire are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

