- Postcode districts
- PE1, PE2, PE3, PE4
- Nearby
- Stamford, March and Spalding
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Cambridgeshire
- Survey
- Free, at your home
What does a new bathroom design cost in Peterborough?
Design comes with the job: the survey, layout and itemised quote are free. In Peterborough, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Peterborough including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Peterborough
We cover every part of Peterborough, including PE1, PE2, PE3 and 1 more postcode districts, and nearby Stamford (11.2 miles) and March (14.2 miles).
Peterborough is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. If you are in Peterborough and weighing a bath against a walk-in shower, the layout options show both with their prices. If your Peterborough bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Most of Cambridgeshire has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A conversation about who uses the room, when, and what does not work about the current one
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A clear view of which changes are cheap and which mean moving drainage or opening floors
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.