- Postcode districts
- PE15
- Nearby
- Wisbech, Ely and Peterborough
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Cambridgeshire
- Survey
- Free, at your home
What does a new bathroom design cost in March?
Design comes with the job: the survey, layout and itemised quote are free. In March, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. Labour costs in East of England put local prices at about 6% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for March including VAT. Your itemised written quote after the free survey is the price that counts.
Working in March
We work right across March — PE15 — and in neighbouring Wisbech and Ely.
March gets the same process as anywhere else: a free survey at your home and a written, itemised quote. A design survey in March covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If you are in March and weighing a bath against a walk-in shower, the layout options show both with their prices.
Most of Cambridgeshire has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

