- Postcode districts
- CW1, CW2
- Nearby
- Nantwich, Sandbach and Winsford
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Moderately hard across most of Cheshire
- Survey
- Free, at your home
What does a new bathroom design cost in Crewe?
Design comes with the job: the survey, layout and itemised quote are free. In Crewe, a complete designed, supplied and fitted bathroom typically costs £6,100–£11,250 including VAT. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Crewe including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Crewe
We work right across Crewe — CW1 and CW2 — and in neighbouring Nantwich and Sandbach.
Crewe has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. For loft rooms and sloping ceilings in Crewe homes, the design checks head height where you stand, not just the floor area. If your Crewe bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Most of Cheshire has moderately hard water. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A conversation about who uses the room, when, and what does not work about the current one
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

