- Postcode districts
- CM8
- Nearby
- Maldon, Braintree and Chelmsford
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Essex
- Survey
- Free, at your home
What does a new bathroom design cost in Witham?
Design comes with the job: the survey, layout and itemised quote are free. In Witham, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. We adjust the national guide for East of England, where prices are typically about 6% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Witham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Witham
In Witham we cover CM8; we also cover Maldon, 5 miles away, and Braintree.
In Witham, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. Whether you are in Witham or elsewhere in Essex, layout options come with an itemised written quote. For loft rooms and sloping ceilings in Witham homes, the design checks head height where you stand, not just the floor area.
Most of Essex has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

