- Postcode districts
- CO1, CO2, CO3, CO4
- Nearby
- Sudbury, Clacton-on-Sea and Witham
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Essex
- Survey
- Free, at your home
What does a new bathroom design cost in Colchester?
Design comes with the job: the survey, layout and itemised quote are free. In Colchester, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Colchester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Colchester
In Colchester we cover CO1, CO2, CO3 and 1 more postcode districts; we also cover Sudbury, 12.7 miles away, and Clacton-on-Sea.
In a city the size of Colchester, parking and access for a skip are worth sorting before the start date — we will ask at the survey. For loft rooms and sloping ceilings in Colchester homes, the design checks head height where you stand, not just the floor area. A design survey in Colchester covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Supplies across most of Essex are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

