- Postcode districts
- CO10
- Nearby
- Colchester, Haverhill and Braintree
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Suffolk
- Survey
- Free, at your home
What does a new bathroom design cost in Sudbury?
Design comes with the job: the survey, layout and itemised quote are free. In Sudbury, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Sudbury including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Sudbury
We work right across Sudbury — CO10 — and in neighbouring Colchester and Haverhill.
Sudbury gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If your Sudbury bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move. Whether you are in Sudbury or elsewhere in Suffolk, layout options come with an itemised written quote.
Water across much of Suffolk is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A clear view of which changes are cheap and which mean moving drainage or opening floors
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

