- Postcode districts
- UB1, UB5, UB6
- Nearby
- Northolt, Southall and Brent
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Greenford?
Design comes with the job: the survey, layout and itemised quote are free. In Greenford, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Greenford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Greenford
In Greenford we cover UB1, UB5 and UB6; we also cover Northolt, 1.5 miles away, and Southall.
In Greenford, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. Whether you are in Greenford or elsewhere in Greater London, layout options come with an itemised written quote. We measure Greenford bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

