What does a new bathroom design cost in Southall?
Design comes with the job: the survey, layout and itemised quote are free. In Southall, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Southall including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Southall
We work right across Southall — UB1, UB2, UB5 and 1 more postcode districts — and in neighbouring Greenford and Heston.
In Southall, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If you are in Southall and weighing a bath against a walk-in shower, the layout options show both with their prices. A design survey in Southall covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A conversation about who uses the room, when, and what does not work about the current one
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.