- Postcode districts
- N7, N19, NW5
- Nearby
- Highbury, Archway and Camden Town
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Holloway?
Design comes with the job: the survey, layout and itemised quote are free. In Holloway, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Holloway including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Holloway
As well as Holloway itself (N7, N19 and NW5), we survey in Highbury, Archway and Camden Town.
London homes in Holloway often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. Whether you are in Holloway or elsewhere in Greater London, layout options come with an itemised written quote. A design survey in Holloway covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

