What does a bathroom renovation cost in Holloway?
Guide price in Holloway: £9,400–£18,750 including VAT, depending on the room and what you choose. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Holloway including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Holloway
In Holloway we cover N7, N19 and NW5; we also cover Highbury, 1.1 miles away, and Archway.
In Holloway, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Holloway home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. A renovation survey in Holloway looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
Decisions to make first
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.