- Postcode districts
- N1, N5, N7
- Nearby
- Islington, Holloway and Stamford Hill
- Guide price
- £9,400–£18,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom renovation cost in Highbury?
Guide price in Highbury: £9,400–£18,750 including VAT, depending on the room and what you choose. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Highbury including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Highbury
We cover every part of Highbury, including N1, N5 and N7, and nearby Islington (1 miles) and Holloway (1.1 miles).
In Highbury, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. In Highbury flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. For listed and period properties in Highbury, we check early whether listed building consent applies to the work you have in mind.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
Decisions to make first
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

