- Postcode districts
- EC1N, NW1, NW3, NW5, NW6, W1T + 11 more
- Nearby
- Holloway, Islington and Archway
- Guide price
- £9,400–£18,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom renovation cost in Camden Town?
In Camden Town, a bathroom renovation typically costs £9,400–£18,750 including VAT, based on London prices. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Camden Town including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Camden Town
We cover every part of Camden Town, including EC1N, NW1, NW3 and 14 more postcode districts, and nearby Holloway (1.1 miles) and Islington (1.8 miles).
London homes in Camden Town often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. Whether your Camden Town bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic. In Camden Town flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
Decisions to make first
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

