Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Greater London · NW2

Bathroom renovation in Kilburn

Bathroom renovation in Kilburn, planned from measurements taken in your home and priced in writing. We cover NW2, NW3 and NW6 and the surrounding area.

£9,400–£18,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Kilburn
Postcode districts
NW2, NW3, NW6
Nearby
Cricklewood, Camden Town and Willesden
Guide price
£9,400–£18,750
Typical time on site
8–15 working days
Water
Very hard across most of Greater London
Survey
Free, at your home

What does a bathroom renovation cost in Kilburn?

For Kilburn, our guide range for a bathroom renovation is £9,400 to £18,750 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£6,200–£10,000
  • Make good and decorate

Structural

£15,000–£27,500
  • New drainage route

Guide prices for Kilburn including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Kilburn

In Kilburn we cover NW2, NW3 and NW6; we also cover Cricklewood, 1.1 miles away, and Camden Town.

London homes in Kilburn often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If your Kilburn home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. For listed and period properties in Kilburn, we check early whether listed building consent applies to the work you have in mind.

Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas
  • Tiling, fitting of the suite and furniture, making good and decorating, then handover
  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
  • A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation

Decisions to make first

Combining rooms

Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.

Shower floor

With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Kilburn: questions

How much should I budget for a bathroom renovation in Kilburn?

A bathroom renovation in Kilburn usually costs £9,400–£18,750 including VAT. The final figure comes down to what you choose and what we find at the survey; your written quote lists every item so you can see where the money goes.

Who handles building control for a bathroom renovation in Kilburn?

Building control for Kilburn is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Kilburn.

Is the home survey in Kilburn really free?

Yes. We visit, measure the room, check the pipework, drainage and electrics, and talk through what you want. You then get a written, itemised quote with no obligation to go ahead.

Should I renovate the bathroom before or after other building work?

If you are also rewiring, replacing the boiler or replumbing the house, do the bathroom at the same time as those works or straight after their first fix. New pipes and cables are then run once, and fresh tiles are not disturbed later.

Bathroom renovation in Kilburn

Book a free home survey in Kilburn. You get a measured layout and an itemised written price before anything is ordered.