- Postcode districts
- NW2, NW6, NW11
- Nearby
- Kilburn, Willesden and Finchley
- Guide price
- £9,400–£18,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom renovation cost in Cricklewood?
As a guide, budget £9,400 to £18,750 including VAT for a bathroom renovation in Cricklewood; your written quote will pin it down. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Cricklewood including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Cricklewood
We work right across Cricklewood — NW2, NW6 and NW11 — and in neighbouring Kilburn and Willesden.
London homes in Cricklewood often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If you have just bought a house in Cricklewood, renovating the bathroom before moving in saves living through the dust. For listed and period properties in Cricklewood, we check early whether listed building consent applies to the work you have in mind.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
Decisions to make first
How far back to strip
Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

