- Postcode districts
- HA0, HA9, UB6
- Nearby
- Brent, Harrow and Greenford
- Guide price
- £9,400–£18,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom renovation cost in Wembley?
As a guide, budget £9,400 to £18,750 including VAT for a bathroom renovation in Wembley; your written quote will pin it down. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Wembley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Wembley
As well as Wembley itself (HA0, HA9 and UB6), we survey in Brent, Harrow and Greenford.
London homes in Wembley often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. In Wembley flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. If your Wembley home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
Decisions to make first
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

