Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Greater London · UB1

Bathroom renovation in Greenford

From UB1 to UB6, we survey and quote for bathroom renovation across Greenford. You get one point of contact and a fixed written price once the details are agreed.

£9,400–£18,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Greenford
Postcode districts
UB1, UB5, UB6
Nearby
Northolt, Southall and Brent
Guide price
£9,400–£18,750
Typical time on site
8–15 working days
Water
Very hard across most of Greater London
Survey
Free, at your home

What does a bathroom renovation cost in Greenford?

Guide price in Greenford: £9,400–£18,750 including VAT, depending on the room and what you choose. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£6,200–£10,000
  • Make good and decorate

Structural

£15,000–£27,500
  • New drainage route

Guide prices for Greenford including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Greenford

We work right across Greenford — UB1, UB5 and UB6 — and in neighbouring Northolt and Southall.

London homes in Greenford often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. In Greenford flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. A renovation survey in Greenford looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper.

Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas
  • New hot and cold pipework and wastes, with isolation valves to each fitting
  • Tiling, fitting of the suite and furniture, making good and decorating, then handover
  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier

Decisions to make first

Pipe material

Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.

Plaster or boards

Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Greenford: questions

How much does a bathroom renovation cost in Greenford?

A bathroom renovation in Greenford usually costs £9,400–£18,750 including VAT. Expect the lower end for a like-for-like job with standard products, and the upper end if things move or you choose premium finishes. Your quote is itemised and fixed in writing once agreed.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Greenford.

Is the home survey in Greenford really free?

Yes. We visit, measure the room, check the pipework, drainage and electrics, and talk through what you want. You then get a written, itemised quote with no obligation to go ahead.

Do you cover UB1 in Greenford?

Yes. We cover all of Greenford, including UB1, UB5 and UB6, and nearby Northolt, Southall and Brent. Survey visits are free and arranged at a time that suits you.

What problems are found when a bathroom is stripped out?

The usual ones are rotten floorboards or joists around the WC and bath, old lead or corroded pipework, joists notched too deeply for pipes, plaster that has come away from the wall and circuits without RCD protection. In homes built before 2000, asbestos can turn up in textured ceiling coatings, old floor tiles, cistern lids or boxing panels.

Bathroom renovation in Greenford

Book a free home survey in Greenford. You get a measured layout and an itemised written price before anything is ordered.