Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Greater London · UB1

Shower installation in Greenford

From UB1 to UB6, we survey and quote for shower installation across Greenford. You get one point of contact and a fixed written price once the details are agreed.

£550–£4,400 inc VAThalf a day to 3 daysFree home survey
Thermostatic shower valve and rainfall head being installed, example for Greenford
Postcode districts
UB1, UB5, UB6
Nearby
Northolt, Southall and Brent
Guide price
£550–£4,400
Typical time on site
half a day to 3 days
Water
Very hard across most of Greater London
Survey
Free, at your home

What does a new shower cost in Greenford?

As a guide, budget £550 to £4,400 including VAT for a new shower in Greenford; your written quote will pin it down. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.

Shower swap

£550–£1,250
  • Like-for-like mixer or electric shower

New shower with enclosure

£1,900–£4,400
  • Tiling to the enclosure

Guide prices for Greenford including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Greenford

We work right across Greenford — UB1, UB5 and UB6 — and in neighbouring Northolt and Southall.

In Greenford, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. We test pressure and flow at Greenford surveys before recommending a shower, so you know how it will perform before you buy. If your Greenford bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two.

Water across much of Greater London is very hard. If your supply in Greenford is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area
  • Supply and fitting of the shower valve or unit, riser rail, handset or fixed head
  • A check of your hot-water system, water pressure and flow rate
  • Removal of the old shower, a full-flow test and a handover on isolating and descaling it

Decisions to make first

Head and handset

A handset on a riser rail is versatile and easy for rinsing; a fixed overhead head feels generous but needs strong flow behind it.

Digital shower

A wall panel sets the exact temperature and flow, while the mixing valve sits out of sight. It needs a power supply and suits a clean, concealed look.

Rules that apply in England

In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

More about shower installation

Shower installation in Greenford: questions

What is the price of a new shower in Greenford?

A new shower in Greenford usually costs £550–£4,400 including VAT. The final figure comes down to what you choose and what we find at the survey; your written quote lists every item so you can see where the money goes.

How long does a new shower take?

Allow half a day to 3 days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Greenford.

Is the home survey in Greenford really free?

Yes. We visit, measure the room, check the pipework, drainage and electrics, and talk through what you want. You then get a written, itemised quote with no obligation to go ahead.

Do you cover UB1 in Greenford?

Yes. We cover all of Greenford, including UB1, UB5 and UB6, and nearby Northolt, Southall and Brent. Survey visits are free and arranged at a time that suits you.

Why does my shower keep going hot and cold?

Usually because it is a manual mixer without thermostatic control, so when someone runs a tap or flushes a toilet, the balance of hot and cold changes. A thermostatic valve corrects for this automatically. On an electric shower, scale build-up or a failing part can cause the same symptom.

Shower installation in Greenford

Book a free home survey in Greenford. You get a measured layout and an itemised written price before anything is ordered.