- Postcode districts
- UB1, UB2, UB5, UB6
- Nearby
- Greenford, Heston and Hayes
- Guide price
- £550–£4,400
- Typical time on site
- half a day to 3 days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new shower cost in Southall?
In Southall, a new shower typically costs £550–£4,400 including VAT, based on London prices. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Like-for-like mixer or electric shower
New shower over bath
- Bath screen
New shower with enclosure
- Tiling to the enclosure
Guide prices for Southall including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Southall
In Southall we cover UB1, UB2, UB5 and 1 more postcode districts; we also cover Greenford, 1.5 miles away, and Heston.
London homes in Southall often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If your Southall bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two. If the shower in your Southall home swings between hot and cold, a thermostatic valve is usually the fix.
Water across much of Greater London is very hard. If your supply in Southall is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
- Supply and fitting of the shower valve or unit, riser rail, handset or fixed head
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
- Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area
Decisions to make first
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Exposed or concealed
An exposed bar valve fixes onto the tiles and is easy to service. A concealed valve sits in the wall for a cleaner look but needs careful setting-out and a plan for access.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

