- Postcode districts
- UB1, UB5, UB6
- Nearby
- Northolt, Southall and Brent
- Guide price
- £2,800–£7,500
- Typical time on site
- 4–8 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does bathroom fitting cost in Greenford?
In Greenford, bathroom fitting typically costs £2,800–£7,500 including VAT, based on London prices. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit only, same layout
- Strip-out, plumbing and fitting
Fit only, new layout
- Electrics by an electrician
Supply and fit
- We source the suite and tiles
Guide prices for Greenford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Greenford
In Greenford we cover UB1, UB5 and UB6; we also cover Northolt, 1.5 miles away, and Southall.
London homes in Greenford often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. Fit-only work in Greenford is quoted the same way as supply and fit: an itemised written quote after a survey of the room. We survey in Greenford before quoting fit-only work, so the soil stack, supplies and walls are checked against the products you have chosen.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Fitting the suite, furniture, screen and accessories, then silicone, testing and a clean handover
- Boarding, tanking in the shower area and tiling labour, with tiles and adhesive from you or sourced by us
- Electrical work by a qualified electrician where lights, a fan or a shaver socket are changing
- First and second-fix plumbing: supplies, wastes, isolation valves and the connection to the soil stack
Decisions to make first
Tiling
Some customers tile themselves or use a separate tiler. That can work, but the order of trades and who tanks the shower area must be agreed first.
Delivery timing
Having everything delivered and checked before the start date avoids a half-finished room while a missing part is sent again.
Rules that apply in England
In England, the Water Supply (Water Fittings) Regulations 1999 apply to the products you supply as well as to the installation. Electrical changes such as new lights or a fan are notifiable under Part P and are done by a registered electrician or notified to building control. New drainage or a new connection to the soil stack can be Part H work.

