- Postcode districts
- HA0, HA9, NW2, NW9, NW10
- Nearby
- Harrow, Bushey and Borehamwood
- Guide price
- £2,800–£7,500
- Typical time on site
- 4–8 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does bathroom fitting cost in Brent?
As a guide, budget £2,800 to £7,500 including VAT for bathroom fitting in Brent; your written quote will pin it down. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit only, same layout
- You supply the suite and tiles
Fit only, new layout
- Boarding and tiling labour
Supply and fit
- See complete fitted bathrooms
Guide prices for Brent including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Brent
We cover every part of Brent, including HA0, HA9, NW2 and 2 more postcode districts, and nearby Harrow (2.2 miles) and Bushey (6.7 miles).
In Brent, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. Fit-only work in Brent is quoted the same way as supply and fit: an itemised written quote after a survey of the room. If your Brent home runs on a combi boiler or an unvented cylinder, we check your chosen shower valve suits it before fitting.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the room, the supplies and drainage, and the products you plan to use
- Boarding, tanking in the shower area and tiling labour, with tiles and adhesive from you or sourced by us
- Electrical work by a qualified electrician where lights, a fan or a shaver socket are changing
- Unpacking and checking delivered items before day one, so damage or missing parts can go back to the seller early
Decisions to make first
Making good
Decide whether you want the quote to cover making good and decorating, or to stop at the tiles so you can paint yourself.
Same layout or new
Keeping the layout keeps labour in the £2,200 to £4,000 range; moving the WC, shower or basin adds pipework and days.
Rules that apply in England
In England, the Water Supply (Water Fittings) Regulations 1999 apply to the products you supply as well as to the installation. Electrical changes such as new lights or a fan are notifiable under Part P and are done by a registered electrician or notified to building control. New drainage or a new connection to the soil stack can be Part H work.

