- Postcode districts
- UB1, UB2, UB5, UB6
- Nearby
- Greenford, Heston and Hayes
- Guide price
- £9,400–£18,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom renovation cost in Southall?
For Southall, our guide range for a bathroom renovation is £9,400 to £18,750 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Southall including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Southall
As well as Southall itself (UB1, UB2, UB5 and 1 more postcode districts), we survey in Greenford, Heston and Hayes.
In Southall, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Southall home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. For listed and period properties in Southall, we check early whether listed building consent applies to the work you have in mind.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
Decisions to make first
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

