- Postcode districts
- NW2, NW6, NW11
- Nearby
- Kilburn, Willesden and Finchley
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Cricklewood?
Design comes with the job: the survey, layout and itemised quote are free. In Cricklewood, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Cricklewood including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Cricklewood
In Cricklewood we cover NW2, NW6 and NW11; we also cover Kilburn, 1.1 miles away, and Willesden.
In Cricklewood, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Cricklewood bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move. If you are in Cricklewood and weighing a bath against a walk-in shower, the layout options show both with their prices.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A conversation about who uses the room, when, and what does not work about the current one
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

