- Postcode districts
- NW6, NW10, W10
- Nearby
- Cricklewood, Shepherds Bush and Kilburn
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Willesden?
Design comes with the job: the survey, layout and itemised quote are free. In Willesden, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Willesden including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Willesden
We cover every part of Willesden, including NW6, NW10 and W10, and nearby Cricklewood (1.8 miles) and Shepherds Bush (2 miles).
In Willesden, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. Whether you are in Willesden or elsewhere in Greater London, layout options come with an itemised written quote. A design survey in Willesden covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

