- Postcode districts
- W11, W12, W14
- Nearby
- Chiswick, Fulham and Willesden
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Shepherds Bush?
Design comes with the job: the survey, layout and itemised quote are free. In Shepherds Bush, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Shepherds Bush including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Shepherds Bush
In Shepherds Bush we cover W11, W12 and W14; we also cover Chiswick, 1.8 miles away, and Fulham.
London homes in Shepherds Bush often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. A design survey in Shepherds Bush covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. We measure Shepherds Bush bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A conversation about who uses the room, when, and what does not work about the current one
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

