- Postcode districts
- E10, E11, E17
- Nearby
- Walthamstow, Stratford and Ilford
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Leytonstone?
Design comes with the job: the survey, layout and itemised quote are free. In Leytonstone, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Leytonstone including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Leytonstone
As well as Leytonstone itself (E10, E11 and E17), we survey in Walthamstow, Stratford and Ilford.
In Leytonstone, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. We measure Leytonstone bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. A design survey in Leytonstone covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

