- Postcode districts
- E3, E14, E15
- Nearby
- Stratford, Canary Wharf and Canning Town
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Bow?
Design comes with the job: the survey, layout and itemised quote are free. In Bow, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Bow including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Bow
As well as Bow itself (E3, E14 and E15), we survey in Stratford, Canary Wharf and Canning Town.
London homes in Bow often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. We measure Bow bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. Whether you are in Bow or elsewhere in Greater London, layout options come with an itemised written quote.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

