- Postcode districts
- E13, E14, E16
- Nearby
- Stratford, Bow and Canary Wharf
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Canning Town?
Design comes with the job: the survey, layout and itemised quote are free. In Canning Town, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Canning Town including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Canning Town
We cover every part of Canning Town, including E13, E14 and E16, and nearby Stratford (1.6 miles) and Bow (1.8 miles).
London homes in Canning Town often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. For loft rooms and sloping ceilings in Canning Town homes, the design checks head height where you stand, not just the floor area. A design survey in Canning Town covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

