- Postcode districts
- E13, E14, E16
- Nearby
- Stratford, Bow and Canary Wharf
- Guide price
- £750–£2,200
- Typical time on site
- 1–2 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom strip-out cost in Canning Town?
Guide price in Canning Town: £750–£2,200 including VAT, depending on the room and what you choose. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Waste taken away
Strip-out and prep
- Walls boarded or patched
Back to brick
- Rotten timber found and repaired
Guide prices for Canning Town including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Canning Town
In Canning Town we cover E13, E14 and E16; we also cover Stratford, 1.6 miles away, and Bow.
In Canning Town, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. We time strip-outs in Canning Town for just before the fit, so you are not left without a bathroom while waiting for products. For Canning Town homes built before 2000, we ask about textured ceilings and old floor tiles before quoting a strip-out.
Supplies across most of Greater London are very hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Lights, fan, shaver socket and heated rail disconnected and made safe by a qualified electrician where needed
- A note of what was found: floor and wall condition, pipe runs and any damaged timber
- Waste loaded and taken away by a licensed waste carrier
- The soil pipe sealed against smells once the WC is off
Decisions to make first
Keep or lose the plaster
Tiles often come off leaving plaster that can be tiled again. If the plaster comes away with them, the wall is boarded or re-plastered.
Timing
Strip out just before the fit rather than weeks ahead, so the house is without a bathroom for as short a time as possible.
Rules that apply in England
In England, stripping out a bathroom does not need planning permission or building regulations approval in itself. Building regulations come in with what follows, such as new drainage under Part H or new circuits under Part P.

