- Postcode districts
- E3, E14, SE16
- Nearby
- Bow, Canning Town and Greenwich
- Guide price
- £750–£2,200
- Typical time on site
- 1–2 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom strip-out cost in Canary Wharf?
Guide price in Canary Wharf: £750–£2,200 including VAT, depending on the room and what you choose. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Suite, tiles and fittings removed
Strip-out and prep
- Floor checked and overlaid
Back to brick
- Room ready for a full renovation
Guide prices for Canary Wharf including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Canary Wharf
In Canary Wharf we cover E3, E14 and SE16; we also cover Bow, 1.5 miles away, and Canning Town.
In Canary Wharf, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. Strip-outs in Canary Wharf include the waste going away with a licensed carrier, so nothing is left on the drive or the pavement. If you are fitting your own bathroom in Canary Wharf, a separate strip-out gets the heavy work and the waste dealt with first.
Most of Greater London has very hard water. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Wall and floor tiles taken off with as little damage as possible to sound plaster
- The soil pipe sealed against smells once the WC is off
- A note of what was found: floor and wall condition, pipe runs and any damaged timber
- Isolating the water and capping the supply to each fitting with a proper end, then checking for leaks
Decisions to make first
Keep or lose the plaster
Tiles often come off leaving plaster that can be tiled again. If the plaster comes away with them, the wall is boarded or re-plastered.
Strip-out only or with prep
Strip-out only leaves walls and floors as found. With prep, walls are boarded or patched and the floor checked and overlaid, ready for fitting.
Rules that apply in England
In England, stripping out a bathroom does not need planning permission or building regulations approval in itself. Building regulations come in with what follows, such as new drainage under Part H or new circuits under Part P.

