Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Greater London · E3

Shower installation in Bow

Thinking about a new shower in Bow? Here is what it usually costs locally, what the work involves and how we go about it.

£550–£4,400 inc VAThalf a day to 3 daysFree home survey
Thermostatic shower valve and rainfall head being installed, example for Bow
Postcode districts
E3, E14, E15
Nearby
Stratford, Canary Wharf and Canning Town
Guide price
£550–£4,400
Typical time on site
half a day to 3 days
Water
Very hard across most of Greater London
Survey
Free, at your home

What does a new shower cost in Bow?

In Bow, a new shower typically costs £550–£4,400 including VAT, based on London prices. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.

Shower swap

£550–£1,250
  • Existing supply and position

New shower with enclosure

£1,900–£4,400
  • Tray, enclosure and valve

Guide prices for Bow including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Bow

We work right across Bow — E3, E14 and E15 — and in neighbouring Stratford and Canary Wharf.

In Bow, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Bow bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two. If the shower in your Bow home swings between hot and cold, a thermostatic valve is usually the fix.

Supplies across most of Greater London are very hard. If your supply in Bow is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Removal of the old shower, a full-flow test and a handover on isolating and descaling it
  • A check of your hot-water system, water pressure and flow rate
  • Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area
  • Supply and fitting of the shower valve or unit, riser rail, handset or fixed head

Decisions to make first

Digital shower

A wall panel sets the exact temperature and flow, while the mixing valve sits out of sight. It needs a power supply and suits a clean, concealed look.

Exposed or concealed

An exposed bar valve fixes onto the tiles and is easy to service. A concealed valve sits in the wall for a cleaner look but needs careful setting-out and a plan for access.

Rules that apply in England

In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

More about shower installation

Shower installation in Bow: questions

What is the price of a new shower in Bow?

A new shower in Bow usually costs £550–£4,400 including VAT. The final figure comes down to what you choose and what we find at the survey; your written quote lists every item so you can see where the money goes.

Is the water hard in Bow?

Supplies across most of Greater London are very hard. If your supply in Bow is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a new shower in Bow?

Building control for Bow is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a new shower take?

Allow half a day to 3 days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Bow.

Can I fit a shower pump with a combi boiler?

No. A combi boiler takes its water from the mains, and connecting a pump directly to the mains supply is not allowed under the water fittings regulations. Shower pumps are only for gravity systems with a cold tank. If a combi shower is weak, the cause is usually the incoming flow, the boiler output or the head, not something a pump can fix.

Shower installation in Bow

Book a free home survey in Bow. You get a measured layout and an itemised written price before anything is ordered.