- Postcode districts
- RM1, RM2, RM3, RM5, RM7, RM11 + 3 more
- Nearby
- Hornchurch, Dagenham and Becontree
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Romford?
Design comes with the job: the survey, layout and itemised quote are free. In Romford, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Romford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Romford
We cover every part of Romford, including RM1, RM2, RM3 and 6 more postcode districts, and nearby Hornchurch (1.8 miles) and Dagenham (1.9 miles).
London homes in Romford often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If you are in Romford and weighing a bath against a walk-in shower, the layout options show both with their prices. For loft rooms and sloping ceilings in Romford homes, the design checks head height where you stand, not just the floor area.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

