- Postcode districts
- KT4, SM1, SM2, SM3, SM5, SM6
- Nearby
- Banstead, Ewell and Epsom
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Sutton?
Design comes with the job: the survey, layout and itemised quote are free. In Sutton, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Sutton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Sutton
As well as Sutton itself (KT4, SM1, SM2 and 3 more postcode districts), we survey in Banstead, Ewell and Epsom.
In Sutton, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. Whether you are in Sutton or elsewhere in Greater London, layout options come with an itemised written quote. If your Sutton bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

