- Postcode districts
- KT17, SM2, SM7
- Nearby
- Sutton, Ewell and Epsom
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does a new bathroom design cost in Banstead?
Design comes with the job: the survey, layout and itemised quote are free. In Banstead, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Banstead including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Banstead
As well as Banstead itself (KT17, SM2 and SM7), we survey in Sutton, Ewell and Epsom.
In Banstead, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If you are in Banstead and weighing a bath against a walk-in shower, the layout options show both with their prices. A design survey in Banstead covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Supplies across most of Surrey are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A conversation about who uses the room, when, and what does not work about the current one
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

