- Postcode districts
- SW17, SW19, SW20
- Nearby
- Morden, Mitcham and Putney
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Wimbledon?
Design comes with the job: the survey, layout and itemised quote are free. In Wimbledon, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Wimbledon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Wimbledon
As well as Wimbledon itself (SW17, SW19 and SW20), we survey in Morden, Mitcham and Putney.
In Wimbledon, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. A design survey in Wimbledon covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If your Wimbledon bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

