What does a bathroom renovation cost in Wimbledon?
For Wimbledon, our guide range for a bathroom renovation is £9,400 to £18,750 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Wimbledon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Wimbledon
As well as Wimbledon itself (SW17, SW19 and SW20), we survey in Morden, Mitcham and Putney.
London homes in Wimbledon often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If your Wimbledon home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. A renovation survey in Wimbledon looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
Decisions to make first
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.