- Postcode districts
- SW6, SW15, SW18
- Nearby
- Fulham, Wimbledon and Chiswick
- Guide price
- £9,400–£18,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom renovation cost in Putney?
As a guide, budget £9,400 to £18,750 including VAT for a bathroom renovation in Putney; your written quote will pin it down. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Putney including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Putney
We cover every part of Putney, including SW6, SW15 and SW18, and nearby Fulham (1.6 miles) and Wimbledon (2.7 miles).
In Putney, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. In Putney flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. A renovation survey in Putney looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- New hot and cold pipework and wastes, with isolation valves to each fitting
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

