- Postcode districts
- SW3, SW8, SW11
- Nearby
- Chelsea, Fulham and Brixton
- Guide price
- £9,400–£18,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom renovation cost in Battersea?
In Battersea, a bathroom renovation typically costs £9,400–£18,750 including VAT, based on London prices. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Battersea including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Battersea
We cover every part of Battersea, including SW3, SW8 and SW11, and nearby Chelsea (1.1 miles) and Fulham (1.9 miles).
London homes in Battersea often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If you have just bought a house in Battersea, renovating the bathroom before moving in saves living through the dust. For listed and period properties in Battersea, we check early whether listed building consent applies to the work you have in mind.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New hot and cold pipework and wastes, with isolation valves to each fitting
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
Decisions to make first
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

