- Postcode districts
- SE5, SE24, SW9
- Nearby
- Peckham, Battersea and Streatham
- Guide price
- £9,400–£18,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom renovation cost in Brixton?
In Brixton, a bathroom renovation typically costs £9,400–£18,750 including VAT, based on London prices. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Brixton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Brixton
As well as Brixton itself (SE5, SE24 and SW9), we survey in Peckham, Battersea and Streatham.
In Brixton, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If you have just bought a house in Brixton, renovating the bathroom before moving in saves living through the dust. In Brixton flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent.
Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- New hot and cold pipework and wastes, with isolation valves to each fitting
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
How far back to strip
Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

