- Postcode districts
- M34, M43, OL6, OL7, SK14, SK16
- Nearby
- Dukinfield, Stalybridge and Droylsden
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a new bathroom design cost in Ashton-under-Lyne?
Design comes with the job: the survey, layout and itemised quote are free. In Ashton-under-Lyne, a complete designed, supplied and fitted bathroom typically costs £6,100–£11,250 including VAT. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Ashton-under-Lyne including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Ashton-under-Lyne
We work right across Ashton-under-Lyne — M34, M43, OL6 and 3 more postcode districts — and in neighbouring Dukinfield and Stalybridge.
In Ashton-under-Lyne, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. Whether you are in Ashton-under-Lyne or elsewhere in Greater Manchester, layout options come with an itemised written quote. A design survey in Ashton-under-Lyne covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Most of Greater Manchester is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A conversation about who uses the room, when, and what does not work about the current one
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

