- Postcode districts
- M34, SK14, SK16
- Nearby
- Denton, Dukinfield and Stalybridge
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a new bathroom design cost in Hyde?
Design comes with the job: the survey, layout and itemised quote are free. In Hyde, a complete designed, supplied and fitted bathroom typically costs £6,100–£11,250 including VAT. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Hyde including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hyde
In Hyde we cover M34, SK14 and SK16; we also cover Denton, 1.6 miles away, and Dukinfield.
In Hyde, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. Whether you are in Hyde or elsewhere in Greater Manchester, layout options come with an itemised written quote. We measure Hyde bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.
Most of Greater Manchester is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A conversation about who uses the room, when, and what does not work about the current one
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

