- Postcode districts
- PO14, PO15, PO16
- Nearby
- Gosport, Portsmouth and Southsea
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a new bathroom design cost in Fareham?
Design comes with the job: the survey, layout and itemised quote are free. In Fareham, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Fareham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Fareham
As well as Fareham itself (PO14, PO15 and PO16), we survey in Gosport, Portsmouth and Southsea.
Homes in and around Fareham vary, so we look at the floor, the walls and the water system before we price anything. For loft rooms and sloping ceilings in Fareham homes, the design checks head height where you stand, not just the floor area. If your Fareham bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Most of Hampshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

